Taxi House Tops Out 02.04.24

Last Thursday, 27 March, the Taxi House team celebrated the topping out of the building at a ceremony on site in Westminster, with the client Cheyne Capital, the main contractor McAleer and Rushe and the project team.

This collection of buildings, designed around a new public space which opens out to the Grand Union Canal, will accommodate a hotel and extensive amenity space including a spa with swimming pool, waterside restaurant, a boutique cinema room, games space and various co-working zones and maker spaces.

The new split level public space, spanning from the entrance of the site to the waterfront, will be activated by retail and lobby space at the upper street level, and a café and performance space at canal level, where a new piazza adjacent to the canal enables public access to this part of the waterside for the first time.

The project is due to complete in spring 2025.

 
 
Link Date Title Location
29.04.24 BCO Awards 2024, Scotland 1 New Park Square date240429
26.04.24 1 Broadgate Tops Out 1 Broadgate date240426
26.04.24 Belgrove House Building Study Tour Belgrove House date240426
18.04.24 Claire Pollock awarded RIBA Honorary Fellowship date240418
15.04.24 Construction commences on Phase 2 of the Television Centre Television Centre Masterplan date240415
12.04.24 The Chartered Institute of Building Award 2024 One Great Cumberland Place date240412
11.04.24 London Square Bermondsey shortlisted for a 2024 Housing Design Award London Square Bermondsey date240411
23.04.24 AIA Central Oklahoma Architecture Awards 2024 The Icehouse District Wheeler Residential Flamingo Tiki date240423
02.04.24 Taxi House Tops Out Taxi House date240402
25.03.24 Tower Hamlets Town Hall wins Civic Trust Award Tower Hamlets Town Hall date240325
21.03.24 Pineapple Awards 2024 Shortlist Tower Hamlets Town Hall Magna Square Soho Place date240321
18.03.24 The Professional NBA Arena Locker Room officially open Professional NBA Arena Locker Room date240318
11.03.24 Tower Hamlets Town Hall Shortlisted for a 2024 RICS Award Tower Hamlets Town Hall date240311
12.03.24 New Study quantifies the carbon impact of Cat A fit out date240312
08.03.24 The Arc officially opens The Arc date240308
06.03.24 Elderberry Walk Officially Opens Elderberry Walk date240306
01.03.24 Cycle to MIPIM 2024 date240301
28.02.24 Angel Square Site Progress Angel Square date240228
27.02.24 Narrative Practice Sessions x AHMM date240227
27.02.24 45 Beech Street submitted for planning date240227
22.02.24 RIBA North West Region Award Shortlist The Alder Centre date240222
20.02.24 RIBA South East Award Shortlist Magna Square date240220
15.02.24 Lansdowne House breaks ground Lansdowne House date240215
15.02.24 RIBA London region Award shortlist 10 Lewis Cubitt Square Montacute Yards The Rowe date240215
14.02.24 National Apprenticeships Week 2024 date240214
12.02.24 RIBA South West + Wessex region Award shortlist One Portwall Square date240212
31.01.24 1 Riva Row, Houston Texas, Site Progress 1 Riva Row date240131
29.01.24 AHMM shortlisted for LSE’s Bankside House redevelopment design competition date240129
17.01.24 Illumanate Competition date240117
12.01.24 Riga Competition date240112
08.01.24 Review of 2023 Burntwood School University of Amsterdam White Collar Factory Tower Hamlets Town Hall 1 New Park Square date240108

Allford
Hall
Monaghan
Morris